1,9 MWp, Greece

Technical Specifications

  • Location: Oinofyta, Greece
  • Construction Year: Phase 1: 2022 + Phase 2: 2023
  • Capacity: 1.9 MWp (1 MWp + 905 kWp)
  • Modules: 2.247 Sharp NU-JD445 + 1.676 NU-JD540
  • Inverter types: 8 X SG110CX + 6 X SG125X-P2 
  • Mounting system: K2 MultiRail + Alumil